What are the basic components of formwork systems?

Formwork includes the forms on or within which the concrete is poured and the frames and bracing which provide stability. Although commonly referred to as part of the formwork assembly, the joists, bearers, bracing, foundations and footings are technically referred to as falsework.

What is Doka formwork system?

Doka Monolithic aluminium formwork system A lightweight aluminium formwork system for casting walls and floors quickly in just a single step.

What is Doka in construction?

Doka is an international producer and supplier of formwork used in all fields of the construction sector. Doka has a worldwide workforce of 7,400, with 160 branches in 60 countries. The consolidated revenues of the Umdasch Group AG amounted to 1411 million euros in 2020.

What are the major objectives considered in formwork?

The main functions which building formwork should perform include (Piekarczyk et al., 2010; Johnston, 2008) :  to provide the safety of the structure during implementation and use, all of the load capacity conditions should have the appropriate safety factors;  to ensure appropriate technical quality such as proper …

What is the order of for removing formwork List 3 steps in the correct order?

Step 1: Wait for the concrete to set. Wait the required time for the concrete to harden and gain enough strength to support itself.

  • Step 2: Start from the top. Remove the highest forms first.
  • Step 3: Remove the stakes.
  • Step 4: Remove the sides.
  • Step 5: Recycle or dispose of formwork.
  • What is a Doka?

    Francisco Lima da Silva, Brazilian footballer nicknamed Doka. The German name (shortened version of Dopplekabin) for the crew cab / double cab version of a pickup, often used worldwide by the fans of the double cab version of the Volkswagen Type 2 pickup.

    Which material is used for formwork?

    Formwork can be made out of timber, plywood, steel, precast concrete or fibre glass used separately or in combination. Steel forms are used in situation where large numbers of re-use of the same forms are necessary. For small works, timber formwork proves useful.

    What are different types of formwork?

    Formwork comes in several types:

    • Traditional timber formwork. The formwork is built on site out of timber and plywood or moisture-resistant particleboard.
    • Engineered Formwork System.
    • Re-usable plastic formwork.
    • Permanent Insulated Formwork.
    • Stay-In-Place structural formwork systems.
    • Flexible formwork.

    What is the order of removing formwork?

    Shuttering forming vertical faces of walls, beams and column sides which bear no load but are used only to retain. The concrete should be removed first. Shuttering forming soffit to slabs should be removed next. Shuttering forming soffit of beams, girders or other heavily loaded shuttering should be removed in the end.

    What is another word for shuttering?

    What is another word for shuttering?

    screening covering
    cloaking shading
    sheltering camouflaging
    shrouding blanketing
    curtaining enshrouding

    What kind of work can do with Doka formwork?

    Doka offers more than formwork solutions for all areas of construction activity – for anything from housing developments to transportation infrastructure and power-generation facilities, or for building the world’s tallest structures.

    What are the components of a Doka system?

    Doka system components are designed for long lifespan, maximum efficiency and the utmost workplace safety. Sharpen your competitive edge by using high-performance Doka forms.

    How are concrete formwork units disassembled at Doka?

    Concrete, dirt and oil are efficiently removed from the formwork. Special equipment is used and the process is industria… Formwork units are disassembled at Doka service centers, customer-owned material is set aside and formwork material that…

    What does Doka’s framed formwork FRAMI XLife do?

    Doka’s framed formwork Frami allows for quick, easy construction at varying heights and slopes. First time Doka’s framed formwork Frami Xlife users learn the ease of assembly.